Friday, 24 August 2018 13:34

Movement restrictions while Rio Vista Bridge is repaired

524 riovista


The Rio Vista Bridge on the Sacramento River suffered a mechanical failure on August 9th and since then, bridge operators have been manually lowering and raising the bridge.  The US Coast Guard and industry stakeholders are coordinating vessel transits with the scheduled openings until operations resume back to normal, possibly on September 24th.

Read 727 times
Login to post comments